Noise reduction of a combustion turbine and a generator

ITS participated in the noise reduction of a combustion turbine and a generator in a power plant in Southeast Asia, designed for simple cycle operation. With a power greater than 80 Megawatt (80MW), this fzacilty is one of the smallest involving large capacity gas turbines (for some, the unit power can exceed 550 MW in a simple cycle and 800 MW in a combined cycle, which is not is not very far from a nuclear unit and notably allows faster construction and therefore commissioning of the energy...

Read more: Noise reduction of a combustion turbine and a generator

Limitation of sound emergence from noisy industrial equipment

ITS participated in the limitation of the sound emergence of noisy industrial equipment in an energy production plant in South-East Asia, based on the use of a combustion turbine coupled to a steam turbine and a generator. This combined cycle gas plant - the largest in the country, with a power of more than 580 MW - will provide electricity to more than 680,000 inhabitants. The main sources of noise to be considered in such cases were:

  • the turbine itself
  • a compartment for the load
  • a plenum...

Read more: Limitation of sound emergence from noisy industrial equipment

Control of the sound environment of an industrial site

ITS contributed to controlling the sound environment of an industrial site in Southern Europe. It was one of the largest natural gas-fired combined cycle power plants in Europe, with an output of over 800 MW, and comprising a combustion turbine coupled with a steam turbine and a generator. ITS participated in the soundproofing of the turbine itself by means of a ventilated enclosure (with 4 walls and a roof) similar to a large industrial building, with specific functionalities and...

Read more: Control of the sound environment of an industrial site

Subcategories